The entire building had asbestos containing floor tile/mastic. All beams, decks, and columns had asbestos fireproofing and the exterior had PCB contamination. Our crew used shafts to move material to the load out area in the basement using specific shafts to segregate waste types, which minimized the volume of hazardous waste. Crews and equipment were organized to efficiently work on multiple floors at the same time. Bayview Environmental Services, Inc. fully contained each floor utilizing negative air, personal decontamination chambers and offload chambers. We staggered our crews into separate floors where each crew completed one floor at a time. In the end all ACM material was bagged and placed into closed topped 40 yard bins and disposed of properly along with all other hazardous material.